November 6, 2023 - Beginning Monday, November 13, 2023, the gate at the Hosey Dam will be opened to lower the river levels. The lowered levels are needed so Public Works and City Utilities staff members can inspect bridge peers and stormwater outfalls along the rivers.
The inspection will take about two months, and when completed, the gate will be closed to hold water back and raise the rivers to their recreational use level.