• Click the project links (») below to view project details.
Locally Funded Projects |
-
» Broadway & Taylor Corridor Improvements
-
- A public meeting will be held on Wednesdey June 7th, 6pm-7pm.
- Click Here for more information.
- Click the links below to view the plans/drawings.
- If there are any comments, ideas or suggestions please email them to Patrick Zaharako @ This email address is being protected from spambots. You need JavaScript enabled to view it.
-
-
» Coldwater Road Improvements - Dupont to Union Chapel
- A&Z Engineering is completing the design of additional travel lanes on Coldwater Road between E. Dupont Road to Union Chapel Road.
- This project will include pedestrian facilities within the corridor that will meet ADA compliance, urban street design with curb and gutter, drainage improvements with new storm sewers, green infrastructure, street lighting and urban landscaping.
- A public meeting was held on May 26, 2022, and another meeting is anticipated to be held before design is completed. Public Works is available for neighborhood meetings near the project area to discuss preliminary plans and timeline for this project.
-
Click links below to view plan view drawings and/or presentation:
- The project is planned to be constructed in two phases and bid through the Board of Public Works with construction in 2023/24 and 2025/26.
-
» Goshen Road - Cambridge to W. Coliseum (Ph. II & III)
- DLZ is completing the design for the next phases of corridor improvements along Goshen Road.
- The project will pick up near Gateway Plaza at Cambridge Blvd and will end at W. Coliseum Boulevard.
- The project consists of road reconstruction, additional driving lanes, pedestrian facilities, adding green infrastructure and landscaping within the corridor.
- The realignment of the Butler and Harris intersection will also be a major improvement that is a part of this project.
- This project will be split into two phases, with the first phase anticipated to be bid through the Board of Public Works at the end of 2024 and construction in 2025.
- A public meeting was held on March 30, 2023. Click links below to view plan drawings and/or presentation.
-
» Leesburg Road Extension
- American Structurepoint is completing the design of a new roundabout at the intersection of Leesburg Road and Main Street.
- Leesburg Road will be extended to the south, down to Jefferson Boulevard with a new signalized T- intersection next to the SweetCars dealership.
- The new road will be a combination of both 2-lane and 3-lane sections. The project will include new sidewalks, street lighting, storm sewers and detention along with a new small structure crossing the Junk Ditch.
- The project addresses intersection safety issues for both Main St. and Jefferson Blvd.
- A public meeting was held on June 30, 2022, and another meeting is anticipated to be held before design is completed.
- Click links below to view plan view drawings, rendering of the new roundabout and/or presentation.
- Leesburg Road Extension - Project Drawings - Public Meeting 06-30-22
- Leesburg Road Extension Project Presentation - Public Meeting 06-30-22
-
Click the thumbnail for a larger view of the Leesburg Road Extension Project - Roundabout Rendering
- The project is planned to be bid through the Board of Public Works at the end of 2023 and constructed in 2024.
-
» Ludwig Road Relocation
- This project involves the relocation of Ludwig Road between Oakbrook Parkway and Coldwater Road.
- The project will include a new roundabout at the intersection of Oakbrook Parkway and Ludwig Road with a new signalized intersection at Coldwater Rd and the new section of roadway.
- The new road is a 2-lane section except where turn lanes are required.
- The roadway improvements will be a conventional street but with curb and gutters, new storm sewer system with a detention basin, sidewalk and trail infrastructure, green infrastructure, and street lighting.
- The project addresses intersection safety issues for Ludwig Road and Coldwater Road.
-
This project is currently in construction with Milestone as the prime contractor.
-
This project is estimated to be completed in June 2023.
- Click links to view plans and renderings:
Federally Funded Projects |
-
» Hillegas Road Widening - State to W. Coliseum Blvd.
- GAI Consultants is completing the design of additional travel lanes on Hillegas Road between W. State Boulevard and W. Coliseum Boulevard.
- This project will include sidewalk and a multi-use path within the corridor that meet ADA compliance, urban street design with curb and gutter, drainage improvements with new storm sewers, green infrastructure, street lighting and urban landscaping.
- The project public input meeting was held on April 21, 2022 click the links below to view the video and/or pdf presentation.
- Click the links below to view the project plans
- The project is planned to be constructed in two phases and let through INDOT in 2025 and 2027.
-
» North Clinton Widening - Auburn Rd. to Mayhew Rd.
- Click the links below to view preliminary engineering documentation:
- Click the links below to view preliminary engineering documentation: